Date posted:
MCI received a call from a new customer whose printing machine had a servo drive and motor going into fault. We carried out an onsite visit to determine the fault and connected our laptop to the drive. We then found that the drive parameters were incorrect and, once we modified…
Date posted:
MCI received a request from a food supplier who wanted a safety system fitted to their automated fryer. MCI designed, manufactured and installed a system based around the customer’s requirements. This system works with the existing machine sensors, to shut the machine down if there is an issue. If you…
Date posted:
MCI was asked by a new customer to service their long-serving weaving loom that had an issue with its bespoke sensors. The sensor is essential as it determined when the shuttle needs refilling before the material runs out. Unfortunately, these sensors were unique to these machines are not made any…
Date posted:
MCI was called out to look at a customer’s pastry making machine. Production had halted – no sausage rolls or steak bakes. Our engineer found the cause of the error and quickly went to work and repaired the machine in good time. The pastry machine was back producing savoury pastries…
Date posted:
MCI received a request from a fire safety company to update an existing control box. As you can see from the pictures, quite an improvement! Another happy customer. If you have any machinery or equipment that needs an electrical or electronic upgrade, call MCI on 01324 611371, to see how…
Date posted:
We received these LEV units to repair from a customer that our friends at Bannatyne Filtration introduced us to. After MCI’s engineers had a look over them, they identified the issues. After a few replacement parts were fitted, the LEV units were back in action. If you are having problems…
Date posted:
MCI was recently asked by Bannatyne Filtration, a company that we have a close working relationship with, to investigate some failing extraction units at a local hospital. After an initial investigation, it was found that some of the motors had failed due to age and the weather. We supplied and…
Date posted:
MCI received this machine control panel from a food manufacturer. Our engineers saw that faulty relays and bases were preventing the machine from running properly. The job was urgent due to production demand, so we turned the repair around in less than a week for the customer. As you can…
Date posted:
MCI received a machine drive from a hot melt glueing system for MDF boards. As you can see, the board was badly damaged. After a good clean up and replacement of damaged parts, the board is back to its old self. If you are having problems with your machine circuitry,…
Date posted:
MCI’s team received a desperate call from an injection moulding company. The company had been told the display and control system was beyond repair. They were not in a position to replace the machine and reached out to us for help. Our engineers carried out initial essential repairs and managed…