Date posted:
MCI received a machine drive from a hot melt glueing system for MDF boards. As you can see, the board was badly damaged. After a good clean up and replacement of damaged parts, the board is back to its old self. If you are having problems with your machine circuitry,…
Date posted:
MCI’s team received a desperate call from an injection moulding company. The company had been told the display and control system was beyond repair. They were not in a position to replace the machine and reached out to us for help. Our engineers carried out initial essential repairs and managed…
Date posted:
MCI received three faulty LEV (local exhaust ventilation) units from a local fabrication company. These ventilation units are used to remove harmful fumes caused by the fabrication process. Here they are repaired, refurbished and ready to return to the customer. If you have an electrical or electronic problem with your…
Date posted:
Have you ever played ‘spot the ball’? Well, MCI is asking you to ‘spot the blown channel’ in this IGBT! The IGBT came from our clients inverter drive (VSD) that was giving inconsistent performance. After testing and a very close inspection, our engineer noticed this tiny hole blown from the…
Date posted:
The new client to MCI sent in a faulty industrial mixer. MCI’s repair team traced the fault to a damaged probe unit built into the control panel. MCI repaired, tested, and returned the unit back to a happy customer. If you are having control unit problems, just give us a…
Date posted:
MCI was, once again, asked to help one of Scotland’s finest historic sites, where the lighting system had failed. We sent out an engineer to have a look. Unfortunately, it looked as if someone had been trying to fix it and had wired it up incorrectly. The resulting surge caused…
Date posted:
A customer in the pharmaceutical distribution industry asked MCI to help reduce the energy usage of one of its lines. MCI designed and installed this automated PLC control system, which reduced the customer’s energy consumption and unnecessary mechanical wear and tear. If you’re interested in learning more about how we…
Date posted:
A prominent packaging company needed an urgent repair of the main touch screen from their HHS multi head glue system as production had stopped. They said that a ‘bang’ was heard from the screen following by a burning smell. Despite being obsolete, MCI was able to repair the unit quickly,…
Date posted:
The customer asked us to have a look at a Ferrocontrol power unit which they brought into the workshop for MCI to repair. Here you can see one of MCI’s engineers checking the control panels in the machine at the customer’s factory. If you have any issues with your control…
Date posted:
MCI received a railway controller from a customer. A chip in the board had clearly blown and the integrated circuit was in need of repair. We believe that an external overload probably caused the fault. MCI replaced the chip and the controller was fixed. If you are having problems with…